summaryrefslogtreecommitdiff
path: root/ui/status/critical_path.go
blob: bf32c589f99318d7b2291154378c01d55968b9dd (plain)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
// Copyright 2019 Google Inc. All rights reserved.
//
// Licensed under the Apache License, Version 2.0 (the "License");
// you may not use this file except in compliance with the License.
// You may obtain a copy of the License at
//
//     http://www.apache.org/licenses/LICENSE-2.0
//
// Unless required by applicable law or agreed to in writing, software
// distributed under the License is distributed on an "AS IS" BASIS,
// WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
// See the License for the specific language governing permissions and
// limitations under the License.

package status

import (
	"android/soong/ui/metrics"

	soong_metrics_proto "android/soong/ui/metrics/metrics_proto"
	"time"

	"google.golang.org/protobuf/proto"
)

func NewCriticalPath() *CriticalPath {
	return &CriticalPath{
		running: make(map[*Action]time.Time),
		nodes:   make(map[string]*node),
		clock:   osClock{},
	}
}

type CriticalPath struct {
	nodes   map[string]*node
	running map[*Action]time.Time

	start, end time.Time

	clock clock
}

type clock interface {
	Now() time.Time
}

type osClock struct{}

func (osClock) Now() time.Time { return time.Now() }

// A critical path node stores the critical path (the minimum time to build the node and all of its dependencies given
// perfect parallelism) for an node.
type node struct {
	action             *Action
	cumulativeDuration time.Duration
	duration           time.Duration
	input              *node
}

func (cp *CriticalPath) StartAction(action *Action) {
	start := cp.clock.Now()
	if cp.start.IsZero() {
		cp.start = start
	}
	cp.running[action] = start
}

func (cp *CriticalPath) FinishAction(action *Action) {
	if start, ok := cp.running[action]; ok {
		delete(cp.running, action)

		// Determine the input to this edge with the longest cumulative duration
		var criticalPathInput *node
		for _, input := range action.Inputs {
			if x := cp.nodes[input]; x != nil {
				if criticalPathInput == nil || x.cumulativeDuration > criticalPathInput.cumulativeDuration {
					criticalPathInput = x
				}
			}
		}

		end := cp.clock.Now()
		duration := end.Sub(start)

		cumulativeDuration := duration
		if criticalPathInput != nil {
			cumulativeDuration += criticalPathInput.cumulativeDuration
		}

		node := &node{
			action:             action,
			cumulativeDuration: cumulativeDuration,
			duration:           duration,
			input:              criticalPathInput,
		}

		for _, output := range action.Outputs {
			cp.nodes[output] = node
		}

		cp.end = end
	}
}

func (cp *CriticalPath) criticalPath() (path []*node, elapsedTime time.Duration, criticalTime time.Duration) {
	var max *node

	// Find the node with the longest critical path
	for _, node := range cp.nodes {
		if max == nil || node.cumulativeDuration > max.cumulativeDuration {
			max = node
		}
	}

	node := max
	for node != nil {
		path = append(path, node)
		node = node.input
	}
	if len(path) > 0 {
		// Log the critical path to the verbose log
		criticalTime = path[0].cumulativeDuration
		if !cp.start.IsZero() {
			elapsedTime = cp.end.Sub(cp.start)
		}
	}
	return
}

func (cp *CriticalPath) longRunningJobs() (nodes []*node) {
	threshold := time.Second * 30
	for _, node := range cp.nodes {
		if node != nil && node.duration > threshold {
			nodes = append(nodes, node)
		}
	}
	return
}

func addJobInfos(jobInfos *[]*soong_metrics_proto.JobInfo, sources []*node) {
	for _, job := range sources {
		jobInfo := soong_metrics_proto.JobInfo{}
		jobInfo.ElapsedTimeMicros = proto.Uint64(uint64(job.duration.Microseconds()))
		jobInfo.JobDescription = &job.action.Description
		*jobInfos = append(*jobInfos, &jobInfo)
	}
}

func (cp *CriticalPath) WriteToMetrics(met *metrics.Metrics) {
	criticalPathInfo := soong_metrics_proto.CriticalPathInfo{}
	path, elapsedTime, criticalTime := cp.criticalPath()
	criticalPathInfo.ElapsedTimeMicros = proto.Uint64(uint64(elapsedTime.Microseconds()))
	criticalPathInfo.CriticalPathTimeMicros = proto.Uint64(uint64(criticalTime.Microseconds()))
	addJobInfos(&criticalPathInfo.LongRunningJobs, cp.longRunningJobs())
	addJobInfos(&criticalPathInfo.CriticalPath, path)
	met.SetCriticalPathInfo(criticalPathInfo)
}