summaryrefslogtreecommitdiff
path: root/ui/status/critical_path.go
diff options
context:
space:
mode:
author Kiyoung Kim <kiyoungkim@google.com> 2024-03-22 18:00:40 +0900
committer Kiyoung Kim <kiyoungkim@google.com> 2024-03-25 11:20:11 +0900
commitee599d6694cf14bf582559b141d0ecf5b6a07105 (patch)
treefd24e9a1be19381ee1b14799d7fa801f7a00887f /ui/status/critical_path.go
parentbfa7f261d11f232e87d3de7d5c12b75813573a4e (diff)
Update linker.config.pb based on package dependency
Current linker.config.pb from the package is generated with auto-detected provide libs, but this misses require libs which can be detected from module dependency. This change adds extra require libs to linker.config.pb generated from system image so it can link with modules outside of system image. Bug: 324995772 Test: Link succeeded from Cuttlefish with soong defined system image Change-Id: I8563ec9ddce2a1648cc9ee55704c9483e137b710
Diffstat (limited to 'ui/status/critical_path.go')
0 files changed, 0 insertions, 0 deletions