diff options
author | 2025-03-24 13:07:01 -0700 | |
---|---|---|
committer | 2025-03-25 19:23:46 -0700 | |
commit | 1abd20d2e232f1a19921aecfb713f28572def8bd (patch) | |
tree | 67a51170976ac4df24f809828f70fc1c63d1c513 /ui/status/critical_path.go | |
parent | fc5e8dc9c38db6628ed1d9172161187da74b066f (diff) |
Make d8-on-eng a stand-alone opt-in feature
Allow a module to override optimization on eng builds only.
This adds `optimize.d8_on_eng` so that the module does not need to check
the build variant itself, but can override the calculation of
`optimize.enabled` for eng builds.
Bug: b/374975543
Test: manual, TH
(cherry picked from https://android-review.googlesource.com/q/commit:4ee862c4f17b04ee8a848f5ea8ac905be42e5209)
Merged-In: I5284072e91063520cece0050eef0a7eefff54323
Change-Id: I5284072e91063520cece0050eef0a7eefff54323
Diffstat (limited to 'ui/status/critical_path.go')
0 files changed, 0 insertions, 0 deletions